OpenApps

Critical Path Partners forensic scheduling MCP — Cursor app

Thirteen tools for Primavera P6 forensic delay analysis: AACE windows (29R-03 MIP 3.3), DCMA-14 health checks, Monte Carlo schedule risk with AACE 122R-22 QRAMM maturity, TIA fragn

Critical Path Partners forensic scheduling MCP

Thirteen tools for Primavera P6 forensic delay analysis: AACE windows (29R-03 MIP 3.3), DCMA-14 health checks, Monte Carlo schedule risk with AACE 122R-22 QRAMM maturity, TIA fragnet (MIP 3.7), collapsed as-built (MIP 3.8), and a claim workbench evidence ledger. Remote server, Streamable HTTP, no API key. Open-source CPM engine (MIT) at github.com/danafitkowski/cpp-cpm-engine.

Store
cursor
Publisher
Not reported
First observed
2026-10-11T11:03:11+00:00

Open the interactive profile to explore rank history, metrics, tools and listing versions.

Data as of 2026-10-13T21:07:33+00:00.

OpenApps records store listings and observed changes. Store ranks are not download counts; launch dates may be derived or use the first observation. Coverage gaps are shown in the interactive catalog.

REST API specification · Guide for AI clients · Manage API keys and MCP connections